TONOPAH TSPP (Nevada – USA)

TONOPAH TSPP (Nevada – USA) 2018-11-12T08:11:32+00:00

Project Description

CUSTOMER

  • Cobra Instalaciones y Servicios

PROJECT

  • Supervision Works for turbine erection in Sugres Combined Cycle

TECHNICAL CARACTERISTICS

  • Turbine-generator set:1 turbo-generator 1+1
  • Gas turbine: General Electric
  • Steam turbine: Skoda
  • Installed Power: 410MW/unit

WORKS DONE

  • Supervision of turbo-generators installation and alignment
  • 1 GE Gas turbine
  • 1 GE Generator
  • 1 Skoda High Pressure steam turbine
  • 1 Skoda Medium/Low Pessure steam turbine1 Skoda Generator
  • Condensed pumps and auxiliary equipment installation

LOCATION

Proyecto TONOPAH TSPP (Nevada – USA)_7Proyecto TONOPAH TSPP (Nevada – USA)_6Proyecto TONOPAH TSPP (Nevada – USA)_5Proyecto TONOPAH TSPP (Nevada – USA)_4Proyecto TONOPAH TSPP (Nevada – USA)_3Proyecto TONOPAH TSPP (Nevada – USA)_2