HPP La Muela II – Spain

HPP La Muela II – Spain 2018-11-06T11:48:24+00:00

Project Description

CUSTOMER

  • IBERDROLA

PROJECT

Assembly  of 4 reversible turbo-Groups of 213 MW in turbination and 186 MW in pumping, each one consisting of:

  • A Francis Voith turbine type
  • An Alstom generator
  • Spherical valves

LOCATION

Cortes de Pallás, Valencia (Spain)

TECHNICAL CARACTERISTICS

Main characteristics and scope:

  • Suction tube 36 tn

  • Spiral chamber 65 tn

  • Lower cover 21 tn

  • Impeller 13 tn

  • Turbine 17 tn

  • Upper cover 35 tn

Lower and upper crossarms. Distribution, Braking jacks, Bearings

  • Rotor 225 tn

  • Alternator 220 tn

  • Excitation

Auxiliary System and Piping

  • Lube oil

  • Control and regulation oil

  • Cooling oil

  • Exhaust, Pumping and Drain

  • Conditioning and Ventilation

  • Water Treatment

  • Compressed Air

  • Fire fighting

WORKS DONE

  • 4 Spherical Valves (60 tn/each) including servos and actuators

  • 4 Suction Gates wagon type including hydraulic system, manoeuvre devices, bypass and electrical cabinet

  • 2 Main Overhead Cranes

  • 4 Hoists at Suction Gates

  • 1 Hoist in drain pump

  • 1 Hoist in cable pit

HPP La Muela II
HPP La Muela II
HPP La Muela II
HPP La Muela II
HPP La Muela II
HPP La Muela II
HPP La Muela II