Date: 06-2017
Project: Valve Revision – Puente Nuevo
Detail of Works done: The Tamoin Applied Engineering department was present in the last shutdown of the Puente Nuevo, Espiel, performed in mid 2017, to conduct the valve revision works.
The revised equipment included valves of different types (Motorised, Gate, Globe, Safety,…) and of different diameters (most of them between 4″ and 16″). The revisions, largely, consist in disassembling the valve to be cleaned and the inspection of the components for possible defects. Depending on the nature of the reinforcement, it is repaired by honing, lapping or recharging.
Tamoin had already carried out these works, in other plants of Viesgo Generación, such as the Thermal Power Plant of Los Barrios.