Project Description

CUSTOMER

  • IBERDROLA

PROJECT

  • Supervision Works turbine erection in Riga Combined Cycle

TECHNICAL CARACTERISTICS

  • Turbine-generator set: 1 turbo-generator 1+1
  • Gas turbine: General Electric – Steam turbine: Skoda
  • Installed Power: 420MW/unit

WORKS DONE

Supervision of turbo-generators installation and alignment, composed of:

  • 1 GE Gas turbine
  • 1 GE Generator
  • 1 Skoda High Pressure steam turbine
  • 1 Skoda brush generator
  • 1 Skoda brush generator
  • Condensed pumps and auxiliary equipment installation
  • Supervision of bridge crane installation